Acceptance testing
Term Key terms bank
Jump to a topic
- Exam format, question types and command words (46)
- Year 11: Programming Fundamentals (69)
- Year 11: The Object-Oriented Paradigm (33)
- Year 11: Programming Mechatronics (29)
- Year 12: Secure Software Architecture (57)
- Year 12: Programming for the Web (59)
- Year 12: Software Automation (35)
- Year 12: The Software Engineering Project (47)
- Diagrams and modelling tools (18)
- Python, SQL, pseudocode and CSS patterns (33)
Definition
The client or end users check that the finished system meets their needs before accepting it.
Example: The school tests the timetable system before signing off.
Found in: course specifications, school notes.
Client/users check the system meets their needs.
Where you'll use it in the test
Syllabus area: Y12 SE Project.
Question types it can appear in
- Multiple choice: Pick the option that matches the definition or example.
- Matching or table: Match it to its description, example or category.
- Short answer: Define, outline or explain it and tie it to the scenario.
Where it has appeared in the paper
The Software Engineering Project (Part B). Part letters follow each paper’s own layout.
Related past questions
- Sample exam Q11 (3 marks): Testing (test data) The Software Engineering Project (Part B) · 3 marks
How to use it
A model sentence
“The client or end users check that the finished system meets their needs before accepting it.” Then apply it: The school tests the timetable system before signing off.
In a short answer, give the definition in your own words first, then tie it to the situation in the question. Do not copy the example above unless it fits the scenario.
Command words used with it
No linked question shows the command word for this term. Across the past short answer questions in this bank the words used most are: Explain, Outline, Describe, Compare, Classify, Analyse. Check the actual word in your question.
Official worked answer
Sample exam Q11 (3 marks): Testing (test data) (3 marks): official criteria and sample answer
Criteria
3: Test data that thoroughly tests the algorithm, with expected outputs and reasons. 2: Tests most of the boundaries and paths, with relevant outputs and reasons. 1: Some relevant information.
Sample answer
1024 -> Desktop (boundary check). 768 -> Tablet (boundary check). 100 -> Phone (below lowest screen size check). 850 -> Tablet (between Tablet and Desktop). 2000 -> Desktop (above highest screen size check).
Go deeper
- Flashcard: Acceptance testing in The Software Engineering Project (Year 12) · study that set
- Memorise: Quality assurance, testing methods and test data
- Key terms bank entry: Acceptance testing
- Notes: Interpret and apply fundamental software development steps to develop secure code,… (Secure Software Architecture (Year 12))
- Notes: Quality assurance, testing methods and test data (The Software Engineering Project (Year 12))
- Full term page: every question, note and marking comment for Acceptance testing
Check yourself
Explain “Acceptance testing” in one sentence, give an example, and name a question type that could test it.
Reveal the answer
The client or end users check that the finished system meets their needs before accepting it.
Example: The school tests the timetable system before signing off.
Could be tested as: Multiple choice, Matching or table, Short answer.