Acceptance testing

Term Key terms bank Y12 SE Project

Definition

The client or end users check that the finished system meets their needs before accepting it.

Example: The school tests the timetable system before signing off.

Found in: course specifications, school notes.

Short version to memorise (key terms bank)

Client/users check the system meets their needs.

Where it is used in the test

Syllabus area: Y12 SE Project.

Question types it can appear in

Where it has appeared in the paper

The Software Engineering Project (Part B). Part letters follow each paper’s own layout.

Related past questions

These are the questions the flashcard set links to this term. Open each one and compare your answer with its marking criteria.

Study links

How to use it in an answer

A model sentence

General advice, built from the definition and example above

“The client or end users check that the finished system meets their needs before accepting it.” Then apply it: The school tests the timetable system before signing off.

In a short answer, give the definition in your own words first, then tie it to the situation in the question. Do not copy the example above unless it fits the scenario.

Command words used with it

General advice

No linked question shows the command word for this term. Across the past short answer questions in this bank the words used most are: Explain, Outline, Describe, Compare, Classify, Analyse. Check the actual word in your question.

Technique for the question types

What the marking guidelines and feedback say

Sample exam Q11 (3 marks): Testing (test data)

Good extras: 1023 (just below desktop boundary) and 767 (just below tablet boundary). Test boundary values, both sides of each boundary, and one value for each path.

Worked answers from the marking guidelines

Sample exam Q11 (3 marks): Testing (test data) (3 marks): criteria and sample answer

Criteria

3: Test data that thoroughly tests the algorithm, with expected outputs and reasons. 2: Tests most of the boundaries and paths, with relevant outputs and reasons. 1: Some relevant information.

Sample answer

1024 -> Desktop (boundary check). 768 -> Tablet (boundary check). 100 -> Phone (below lowest screen size check). 850 -> Tablet (between Tablet and Desktop). 2000 -> Desktop (above highest screen size check).

Open the question page

Common mistakes

General advice
  • Use the term exactly as the syllabus words it, then link it to the scenario in the question; the 2025 feedback repeatedly rewards using the stimulus.
  • Answer the command word: outline gives main points only, explain gives a reason or cause, discuss gives both sides.

Same group in the syllabus: Functional testing · Live data · Simulated data · Beta testing · Volume testing · Corrective maintenance · Adaptive maintenance · Perfective maintenance · Functional requirement · Driver (test driver)