TK Study

Software Engineering › Key terms › Y11 Programming Fundamentals › Maintenance

Maintenance

Process Term Y11 Programming Fundamentals Y12 SE Project

Definition

Maintenance Y11 Programming Fundamentals Process

Changes made after release to keep software working and useful: corrective (fix errors), adaptive (new environment) and perfective (improve or add features).

Example: A patch to fix a crash is corrective maintenance.

Found in: syllabus, school notes, past SDD papers.

Maintenance Y12 SE Project Term

Updating the software after release to fix errors, add features or adapt to change.

Example: Release a patch for a security bug.

Found in: syllabus, school notes, past SDD papers.

Where it is used in the test

Syllabus area: Y11 Programming Fundamentals Y12 SE Project.

Question types it can appear in

Where it has appeared in the paper

The Software Engineering Project (Part D). Part letters follow each paper’s own layout.

Related past questions

These are the questions the flashcard set links to this term. Open each one and compare your answer with its marking criteria.

Study links

How to use it in an answer

A model sentence

General advice, built from the definition and example above

“Changes made after release to keep software working and useful: corrective (fix errors), adaptive (new environment) and perfective (improve or add features).” Then apply it: A patch to fix a crash is corrective maintenance.

In a short answer, give the definition in your own words first, then tie it to the situation in the question. Do not copy the example above unless it fits the scenario.

Command words used with it

From the linked past questions
  • Explain: Relate cause and effect; make the relationship between things evident; provide why and/or how. (2022 Software Design and Development HSC Q22 (6 marks): Maintenance)

Technique for the question types

What the marking guidelines and feedback say

2022 Software Design and Development HSC Q22 (6 marks): Maintenance

Old-syllabus question. Use for practice on the overlapping skill only. The new Software Engineering exam does not use the old SDD terms (e.g. CASE tools, system flowcharts, EBNF, assembly).

Common mistakes

General advice
  • Use the term exactly as the syllabus words it, then link it to the scenario in the question; the 2025 feedback repeatedly rewards using the stimulus.
  • Answer the command word: outline gives main points only, explain gives a reason or cause, discuss gives both sides.

Same group in the syllabus: Software development steps (the order) · Requirements definition · Determining specifications · Design · Development · Integration · Testing and debugging · Installation · Online code collaboration tools · Requirements · Need or opportunity · Feasibility · Functionality and performance requirements · Boundaries

← MainlineIn Y11 Programming FundamentalsMulti-dimensional array →